Logo

Cart

Click title to display cart contents.
0 Items $0.00

Bobcat 335 Compact Excavator Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $29.99

Complete workshop & service manual with electrical wiring diagrams for Bobcat 335 Compact Excavator. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Bobcat 335 Compact Excavator service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.


6904774 (7-07) - 335 Compact Excavator Operation & Maintenance Manual.pdf
6904775 (10-09) - 335 Compact Excavator Service Manual.pdf
6986948 (10-09) - 335 Compact Excavator Operation & Maintenance Manual.pdf
6986949 (5-10) - 335 Compact Excavator Service Manual.pdf

EXCERPT:
CONTENTS
FOREWORD. . . . . II
SAFETY INSTRUCTIONS . . . . . . . . . . . . . IV
FIRE PREVENTION . . . . . . . . . . . . . . . . . .VI
SERIAL NUMBER LOCATIONS . . . . . . . .VIII
DELIVERY REPORT. . . . . . . . . . . . . . . . . . IX
EXCAVATOR IDENTIFICATION . . . . . . . . . X
SAFETY AND MAINTENANCE. . . . . . . 10-01
HYDRAULIC SYSTEM . . . . . . . . . . . . . 20-01
UNDERCARRIAGE. . . . . . . . . . . . . . . . 30-01
UPPERSTRUCTURE & SWING SECTION . . . . . . . . . . . . . . . . 40-01
ELECTRICAL SYSTEM AND ANALYSIS . . . . . . . . . . . . . . . . . . 50-01
ENGINE SERVICE . . . . . . . . . . . . . . . . 60-01
HEATING, VENTILATION, AIR CONDITIONING . . . . . . . . . . . . 70-01
SPECIFICATIONS. . . . . . . . . . . . . . SPEC-01

BOOM SWING PEDAL
Description
The boom swing pedal offsets the boom with respect to the upperstructure for digging close to a structure.
Push the toe of the pedal to swing the boom to the right, push the heel to swing the boom to the left.
Removal And Installation
Remove the floor mat and floor panel. (See Removal And Installation (Cab Equipped) on Page 40-90-3.)
Figure 40-100-1
Remove the nut (Item 1), and washers from the pedal linkage (Item 2) [Figure 40-100-1].
Remove the linkage.
Figure 40-100-2

Additional 10% off on US$30+ order paid with Credit Card: 10POFF.

To pay in your local currency (EURO, GBP, AUD, CAD, HKD, JPY, etc.), please contact us.