Logo

Cart

Click title to display cart contents.
0 Items $0.00

Hyundai Construction Wheel Loader HL740 Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $29.99

Complete workshop & service manual with electrical wiring diagrams for Hyundai Construction Wheel Loader HL740-3, HL740TM-3, HL740-7, HL740TM-7, HL740-7A, HL740TM-7A, HL740-7S, HL740-9, HL740-9A, HL740TM-9A, HL740-9S, HL740-9SB. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This 600 MB PDF service & repair manual for Hyundai Construction Wheel Loader HL740-3, HL740TM-3, HL740-7, HL740TM-7, HL740-7A, HL740TM-7A, HL740-7S, HL740-9, HL740-9A, HL740TM-9A, HL740-9S, HL740-9SB (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

EXCERPT:
CONTENTS
SECTION 1 GENERAL
Group 1 Safety Hints - - - - - 1-1
Group 2 Specifications - - - - - 1-10
Group 3 Operational Checkout Record Sheet - - - - - - 1-25
SECTION 2 ENGINE
Group 1 Structure and Function - - - - - 2-1
Group 2 Engine speed and Stall rpm - - - - - 2-10
Group 3 Fuel Warmer System--------- - - - - - 2-11
SECTION 3 POWER TRAIN SYSTEM
Group 1 Structure and Function - - - - - 3-1
Group 2 Operational Checks and Troubleshooting - - - - - - - 3-64
Group 3 Test and Adjustments - - - - - - - 3-75
Group 4 Disassembly and Assembly - - - - - 3-77
SECTION 4 BRAKE SYSTEM
Group 1 Structure and Function - - - - - 4-1
Group 2 Operational Checks and Troubleshooting - - - - - - - 4-32
Group 3 Tests and Adjustments - - - - - 4-39
Group 4 Disassembly and assembly - - - - - - 4-41
SECTION 5 STEERING SYSTEM
Group 1 Structure and Function - - - - - 5-1
Group 2 Operational Checks and Troubleshooting - - - - - - - 5-11
Group 3 Tests and Adjustments - - - - - 5-17
Group 4 Disassembly and Assembly - - - - - 5-23
SECTION 6 WORK EQUIPMENT
Group 1 Structure and Function - - - - - 6-1
Group 2 Operational Checks and Troubleshooting - - - - - - - 6-42
Group 3 Tests and Adjustments - - - - - 6-52
Group 4 Disassembly and Assembly - - - - - 6-67
SECTION 7 ELECTRICAL SYSTEM
Group 1 Component Location - - - - - - 7-1
Group 2 Electrical Circuit - - - - - 7-3
Group 3 Monitoring System - - - - - - 7-21
Group 4 Electrical Component Specification - - - - - - 7-59
Group 5 Connectors - - - - - - - 7-66
Group 6 Troubleshooting - - - - - - 7-87

DISASSEMBLY
Cleanliness is the primary means of assuring satisfactory the priority valve life.
Select clean place.
Before removing the piping, clean the surrounding area of valve ports.
Fix the body (1) in a vise with copper or lead sheets.
Do not over tighten jaws.
Loosen plug (3) for LS port.
Remove spring (4).
Remove plug (6) and separate O-ring (7) individually.

Additional 10% off on US$30+ order paid with Credit Card: 10POFF.

To pay in your local currency (EURO, GBP, AUD, CAD, HKD, JPY, etc.), please contact us.