Hyundai Azera/Grandeur 1998-2016 Workshop Repair & Service Manual
Catalog:
Model:
Complete digital official shop manual contains service, maintenance, and troubleshooting information for the 1998-2016 Hyundai Azera/Grandeur (Grandeur XG250, XG300, XG350). Diagnostic and repair procedures are covered in great detail to repair, maintain, rebuild, refurbish or restore your vehicle like a professional mechanic in local service/repair workshop. This cost-effective quality manual is 100% complete and intact as should be without any missing pages. It is the same factory shop manual used by dealers that guaranteed to be fully functional to save your precious time.
This manual for Hyundai Azera/Grandeur 1998-2016 is divided into different sections. Each section covers a specific component or system and, in addition to the standard service procedures, includes disassembling, inspecting, and assembling instructions. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. It is in the cross-platform PDF document format so that it works like a charm on all kinds of devices. You do not need to be skilled with a computer to use the manual.
EXCERPT:
2014 ENGINE Cylinder Head Assembly - Azera
Installation
1. Install the CVVT assembly.
Tightening torque: 64.7 ~ 76.5N.m (6.6 ~ 7.8kgf.m, 47.7 ~ 56.4lb-ft)
CAUTION: Install camshaft-inlet to dowel pin of CVVT assembly.
At this time, attend not to be installed to oil hole of camshaftinlet.
Hold the hexagonal head wrench portion of the camshaft with a vise, and install the bolt and CVVT assembly.
Do not rotate CVVT assembly when camshaft is installed to dowel pin of CVVT assembly.
A. A: LH exhaust CVVT
B. B: LH intake CVVT
C. C: RH intake CVVT
D. D: RH exhaust CVVT
NOTE: When installing the CVVT assembly bolt, prevent the camshaft from rotating by using a wrench at position A.
2. Install the timing chain. (Refer to "TIMING CHAIN ")
CAMSHAFT
COMPONENTS AND COMPONENTS LOCATION
REPAIR PROCEDURES
Removal RH
1. Remove the RH bank timing chain. (Refer to "TIMING CHAIN ")
2. Remove the RH exhaust CVVT oil control valve. (Refer to "CVVT OIL CONTROL VALVE (OCV)"
3. Remove the RH camshaft bearing cap (A) and thrust bearing cap (B).
...