Logo

Cart

Click title to display cart contents.
0 Items $0.00

Komatsu Skid-Steer Loader SK818, SK820 Workshop Repair & Service Manual

Catalog: 

Make: 

Model: 

US Dollar: $29.99

Complete factory shop manual including electrical wiring diagrams for Komatsu SK818-5, SK820-5 turbo, SK820-5N Skid-Steer Loader. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page to save your precious time.

This Komatsu Skid-Steer Loaders SK818-5, SK820-5 turbo, SK820-5N repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

FILELIST:
CEAM016201 - Skid-Steer Loader SK820-5N Operation & Maintenance Manual.pdf
CEBM016001 - Skid-Steer Loader SK820-5N Shop Manual.pdf
WEAM004502 - Skid-Steer Loader SK818-5 Operation & Maintenance Manual.pdf
WEAM005102 - Skid-Steer Loader SK820-5 turbo Operation & Maintenance Manual.pdf
WEAM005400 - Skid-Steer Loader SK820-5 turbo Operation & Maintenance Manual.pdf
WEAM005402 - Skid-Steer Loader SK820-5 turbo Operation & Maintenance Manual.pdf
WEBM005000 - Skid-Steer Loader SK818-5, SK820-5 turbo Shop Manual.pdf
WEBM005001 - Skid-Steer Loader SK818-5, SK820-5 turbo Shop Manual.pdf
WEBM005200 - Skid-Steer Loader SK818-5, SK820-5 turbo Shop Manual.pdf

EXCERPT:
CONTENTS
10 STRUCTURE AND FUNCTION
20 TESTING AND ADJUSTING
30 DISASSEMBLY AND ASSEMBLY
40 MAINTENANCE STANDARD
...
TESTING AND ADJUSTMENTS - CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
★ Check the injection timing of the No.1 cylinder by means of the No.1 union of the injection pump.
★ The cylinders are numbered 1-2-3-4 counting from the flywheel side.
★ The spark advance notches of 0°-10°-15°-20°; are also marked on the flywheel. In order to read the intermediate values, sub-divide the sections between the two marks into equal lengths.
1 - Remove the cap (1) of the flywheel casing.
2 - Pass a screwdriver between the teeth and rotate the flywheel in a counter-clockwise direction (as seen from the flywheel side) until the 1/4 notch of the flywheel is aligned with the notch (2) marked inside the hole in the casing.
★ In this position, the piston of the No. 1 cylinder is at the top dead centre (B.T.D.C.). Check that the cylinder is in a compression stroke, i.e. that both valves are closed.
★ Once the B.T.D.C. has been ascertained, rotate the drive shaft in a clockwise direction (seen from the flywheel side) for about 25 teeth.
3 - Take off the clamp (3) and disconnect all the fuel delivery pipes (4) from the injection pump (5).
4 - Rotate the flywheel slowly in a counter-clockwise direction (seen from the flywheel side), checking carefully the level of the fuel in the No. 1 union of the injection pump.
Stop the rotation when the fuel level starts to rise.
5 - Check the position of the notches at 15° and 10° that appear in the hole in the casing and, in function of the position, establish the true fuel injection timing.
★ In order to determine the degrees of intermediate fuel injection timing, sub-divide the space between 10° and 15°.
★ Normal fuel injection timing: 12±1°
...

Additional 10% off on US$30+ order paid with Credit Card: 10POFF.

To pay in your local currency (EURO, GBP, AUD, CAD, HKD, JPY, etc.), please contact us.