Caterpillar Forwarder 554 & 574 Factory Service & Shop Manual
Catalog:
Model:
Complete workshop repair service manual with electrical wiring diagrams for Caterpillar Forwarder 554 & 574. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.
Caterpillar Forwarder 554 & 574 service repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.
1,532 pages, bookmarked, Searchable, Printable, high quality PDF
MANUAL LIST:
RENR6058 - Schematic (574 Forwarder Hydraulic System).pdf
RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems)
RENR3026 - Specifications (554 & 574 Forwarders Power Train)
RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train)
RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3032 - Schematic (554 Forwarder Hydraulic System)
RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train)
RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement)
RENR3061 - Schematic (574 Forwarder Hydraulic System)
RENR3037 - Systems Operation (554 Forwarder & 574 Forwarder Electrical System).pdf
...
RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems)
Air Conditioner - Assemble.pdf
Air Conditioner - Disassemble.pdf
Air Conditioner - Install.pdf
Air Conditioner - Remove.pdf
Bank Valve (Eight) (Implement) - Assemble.pdf
Bank Valve (Eight) (Implement) - Disassemble.pdf
Bank Valve (Eight) (Implement) - Install.pdf
Bank Valve (Eight) (Implement) - Remove.pdf
Bank Valve (Two) (Bogie Lift) - Assemble.pdf
Bank Valve (Two) (Bogie Lift) - Disassemble.pdf
Bank Valve (Two) (Bogie Lift) - Install.pdf
Bank Valve (Two) (Bogie Lift) - Remove.pdf
Bogie Cylinder - Install.pdf
Bogie Cylinder - Remove.pdf
Bogie Float Valve - Assemble.pdf
Bogie Float Valve - Disassemble.pdf
Bogie Float Valve - Install.pdf
Bogie Float Valve - Remove.pdf
Boom Cylinder - Install.pdf
Boom Cylinder - Remove.pdf
Boom - Install.pdf
Boom - Remove.pdf
Boom Tilt Cylinder - Install.pdf
Boom Tilt Cylinder - Remove.pdf
Bunk - Install.pdf
Bunk - Remove.pdf
Cab - Install.pdf
Cab - Remove.pdf
Cab Support Bar - Install.pdf
Cab Support Bar - Remove.pdf
Cab Tilt Cylinder - Install.pdf
Cab Tilt Cylinder - Remove.pdf
Combination Valve (Four Function) - Assemble.pdf
Combination Valve (Four Function) - Disassemble.pdf
Combination Valve (Four Function) - Install.pdf
Combination Valve (Four Function) - Remove.pdf
Extendable Stick Cylinder - Install.pdf
Extendable Stick Cylinder - Remove.pdf
Extendable Stick - Install.pdf
Extendable Stick - Remove.pdf
Front Frame from Rear Frame - Separate.pdf
Gate Cylinder (Horizontal) - Install.pdf
Gate Cylinder (Horizontal) - Remove.pdf
Gate Cylinder (Vertical) - Install.pdf
Gate Cylinder (Vertical) - Remove.pdf
Gate - Install.pdf
Gate - Remove.pdf
Grapple Cylinder - Install.pdf
Grapple Cylinder - Remove.pdf
Grapple - Install.pdf
Grapple - Remove.pdf
Grapple Rotator - Assemble.pdf
Grapple Rotator - Disassemble.pdf
Grapple Rotator - Install.pdf
Grapple Rotator - Remove.pdf
Hand Pump (Cab Tilt) - Install.pdf
Hydraulic Tank - Install.pdf
Hydraulic Tank - Remove.pdf
Ladder Cylinder - Install.pdf
Ladder Cylinder - Remove.pdf
Log Loader Pillar - Assemble.pdf
Log Loader Pillar - Disassemble.pdf
Log Loader Pillar - Install.pdf
Log Loader Pillar - Remove.pdf
Oscillation Lock Cylinder - Install.pdf
Oscillation Lock Cylinder - Remove.pdf
Piston Pump (Implement) - Assemble.pdf
Piston Pump (Implement) - Disassemble.pdf
Piston Pump (Implement) - Install.pdf
Piston Pump (Implement) - Remove.pdf
Pressure Reducing Valve (Maximum Signal) - Assemble.pdf
Pressure Reducing Valve (Maximum Signal) - Disassemble.pdf
Pressure Reducing Valve (Maximum Signal) - Install.pdf
Pressure Reducing Valve (Maximum Signal) - Remove.pdf
Pressure Reducing Valve (Steering Signal) - Assemble.pdf
Pressure Reducing Valve (Steering Signal) - Disassemble.pdf
Pressure Reducing Valve (Steering Signal) - Install.pdf
Pressure Reducing Valve (Steering Signal) - Remove.pdf
Priority Valve (Steering) - Assemble.pdf
Priority Valve (Steering) - Disassemble.pdf
Priority Valve (Steering) - Install.pdf
Priority Valve (Steering) - Remove.pdf
Pump Drive - Remove and Install.pdf
Relief Valve (Swing Crossover) - Assemble.pdf
Relief Valve (Swing Crossover) - Disassemble.pdf
Relief Valve (Swing Crossover) - Install.pdf
Relief Valve (Swing Crossover) - Remove.pdf
Seat - Remove and Install.pdf
Steering Cylinder - Install.pdf
Steering Cylinder - Remove.pdf
Steering Frame Lock - Separate and Connect.pdf
Steering Metering Pump - Assemble.pdf
Steering Metering Pump - Disassemble.pdf
Steering Metering Pump - Install.pdf
Steering Metering Pump - Remove.pdf
Stick Cylinder - Install.pdf
Stick Cylinder - Remove.pdf
Stick - Install.pdf
Stick - Remove.pdf
Window Wiper and Wiper Motor - Remove and Install.pdf
RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems).pdf
RENR3026 - Specifications (554 & 574 Forwarders Power Train)
Accumulator (Brake).pdf
Accumulator Charging Valve (Brake).pdf
Accumulator (Transmission Gearbox).pdf
Bypass Valve (Power Train Oil Cooler).pdf
Combination Valve (Differential Lock and Parking Brake).pdf
Front Bogie.pdf
Gear Pump (Transmission Gearbox).pdf
Gearshift Control Valve.pdf
Oil Filter (Power Train Charging System).pdf
Oil Filter (Transmission Gearbox).pdf
Oil Level Sensor (Power Train Oil Tank).pdf
Piston Motor (Power Train).pdf
Piston Pump (Power Train).pdf
Pressure Sensor (Drive Loop).pdf
Pressure Sensor (Gearshift).pdf
Pressure Sensor (Power Train Charging System).pdf
Pressure Switch (Brake Light).pdf
Pressure Switch (Parking Brake Oil).pdf
Pressure Switch (Service Brake Oil).pdf
Rear Bogie.pdf
Rim Group.pdf
Solenoid Valve (Cold Start).pdf
Temperature Sensor (Transmission Gearbox Oil and Power Train Oil).pdf
Transmission Gearbox - 554 Forwarder.pdf
Transmission Gearbox - 574 Forwarder (1FM1-236).pdf
Transmission Gearbox - 574 Forwarder (1FM237-433).pdf
Transmission Gearbox.pdf
RENR3026 - Specifications (554 & 574 Forwarders Power Train).pdf
RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train)
Accelerator Pedal.pdf
Braking System.pdf
Differential.pdf
Final Drive and Bogie.pdf
Gearshift Valve - 1FM1-433.pdf
Gearshift Valve - 554 Forwarder 1AM1-UP.pdf
Gearshift Valve - 574 Forwarder 1FM434-UP.pdf
General Information.pdf
Hydrostatic Drive System.pdf
Monitoring System.pdf
Off Switches.pdf
Piston Motor (Power Train) - 554 Forwarder and 574 Forwarder 1FM1-433.pdf
Piston Motor (Power Train).pdf
Piston Pump (Power Train) - 554 Forwarder and 574 Forwarder 1FM1-433.pdf
Piston Pump (Power Train) - 574 Forwarder 1FM434-UP.pdf
Transmission Gearbox - 554 Forwarder.pdf
Transmission Gearbox - 574 Forwarder 1FM1-433.pdf
Transmission Gearbox - 574 Forwarder 1FM434-UP.pdf
RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train).pdf
RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System)
Bank Valve (Eight) (Implement).pdf
Bank Valve (Two) (Bogie Lift).pdf
Bogie Float Valve.pdf
Boom Cylinder.pdf
Boom Tilt Cylinder.pdf
Bypass Valve (Hydraulic Oil Cooler).pdf
Combination Valve (Ladder and Gate).pdf
Diverter Valve (Boom Tilt Cylinder and Gate Cylinder).pdf
Extendable Stick Cylinder.pdf
Grapple Cylinder.pdf
Grapple Rotator.pdf
Hydraulic Cylinder (Bogie Lift and Steering).pdf
Hydraulic Tank Fill Pump and Motor.pdf
Lift Cylinder.pdf
Log Loader Pillar Base.pdf
Oil Filter (Implement Case Drain).pdf
Oil Level Sensor (Hydraulic Tank).pdf
Pilot Oil Accumulator (Dead Engine Lower).pdf
Piston Pump (Implement) - 554 Forwarder.pdf
Piston Pump (Implement) - 574 Forwarder.pdf
Pressure Reducing Valve (Maximum Signal).pdf
Pressure Reducing Valve (Steering Signal).pdf
Pressure Sensor (Filter Return).pdf
Priority Valve (Steering).pdf
Relief Valve (Swing Crossover).pdf
Solenoid Valve (Oscillation Lock).pdf
Steering Metering Pump.pdf
Stick Cylinder.pdf
Toggle Switch (Tank Fill and Vacuum).pdf
Vacuum Pump and Motor.pdf
RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System).pdf
RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System)
Bank Valve (Eight) (Implement).pdf
Bogie Lift System.pdf
Gate Control System.pdf
General Information.pdf
Implement Control System.pdf
Implement Pump.pdf
Load Sensing Signal System.pdf
Main Hydraulic System.pdf
Monitoring and Control System.pdf
Oscillation Lock System.pdf
Steering System.pdf
Swing System.pdf
RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System).pdf
RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System)
Boom Tilt Cylinder and Gate Cylinder (Horizontal) Pressure - Test and Adjust.pdf
Combination Valve (Ladder and Gate) - Test and Adjust.pdf
Extendable Stick Cylinder Pressure - Test and Adjust.pdf
Grapple Cylinder Pressure - Test and Adjust.pdf
Implement Control - Test and Adjust.pdf
Implement Pump High Pressure Cutoff - Test and Adjust.pdf
Implement Pump Margin Pressure - Test and Adjust.pdf
Implement Pump Standby Pressure - Test and Adjust.pdf
Machine Preparation for Troubleshooting.pdf
Pilot Hydraulic System - Purge.pdf
Pilot Oil Accumulator (Dead Engine Lower) - Test and Charge.pdf
Pressure Reducing Valve (Steering Signal) - Test and Adjust.pdf
Relief Valve (Gate Cylinder) - Test and Adjust - Vertical.pdf
Steering Cylinder Pressure - Test and Adjust.pdf
Troubleshooting.pdf
Visual Inspection.pdf
RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System).pdf
RENR3032 - Schematic (554 Forwarder Hydraulic System)
Main.pdf
RENR3032 - Schematic (554 Forwarder Hydraulic System).pdf
RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train)
Accumulator (Brake) - Remove and Install.pdf
Accumulator (Transmission) - Remove and Install.pdf
Bogie - Assemble.pdf
Bogie Axle (Front) - Install.pdf
Bogie Axle (Front) - Remove.pdf
Bogie Axle (Rear) - Install.pdf
Bogie Axle (Rear) - Remove and Install.pdf
Bogie - Disassemble.pdf
Bogie - Install.pdf
Bogie Oscillation Bearing - Remove and Install.pdf
Bogie - Remove.pdf
Brake - Assemble.pdf
Brake Charging Valve - Remove and Install.pdf
Brake Control Valve (Front) - Remove and Install.pdf
Brake Control Valve (Rear) - Remove and Install.pdf
Brake Cylinder - Install.pdf
Brake Cylinder - Remove.pdf
Brake - Disassemble.pdf
Differential - Assemble.pdf
Differential - Disassemble.pdf
Differential from Left Brake - Separate.pdf
Differential Lock - Remove and Install.pdf
Differential to Left Brake - Connect.pdf
Drive Shaft (Center) - Remove and Install.pdf
Drive Shaft (Front) - Remove and Install.pdf
Drive Shaft (Rear) - Remove and Install.pdf
Final Drive - Assemble.pdf
Final Drive - Disassemble.pdf
Final Drive - Install.pdf
Final Drive - Remove.pdf
Gear Pump (Transmission) - Assemble.pdf
Gear Pump (Transmission) - Disassemble.pdf
Gear Pump (Transmission) - Install.pdf
Gear Pump (Transmission) - Remove.pdf
Gearshift Valve - Assemble.pdf
Gearshift Valve - Disassemble.pdf
Gearshift Valve - Install.pdf
Gearshift Valve - Remove.pdf
Hydraulic Tank Fill Pump and Motor - Remove and Install.pdf
Hydraulic Tank - Install.pdf
Hydraulic Tank - Remove.pdf
Piston Motor (Power Train) - Assemble.pdf
Piston Motor (Power Train) - Disassemble.pdf
Piston Motor (Power Train) - Install.pdf
Piston Motor (Power Train) - Remove.pdf
Piston Pump (Power Train) - Assemble.pdf
Piston Pump (Power Train) - Disassemble.pdf
Piston Pump (Power Train) - Install.pdf
Piston Pump (Power Train) - Remove.pdf
Right Brake from Differential - Separate.pdf
Right Brake to Differential - Connect.pdf
Steering Frame Lock - Separate and Connect.pdf
Transmission and Output Transfer Gears - Assemble.pdf
Transmission and Output Transfer Gears - Disassemble.pdf
Transmission and Output Transfer Gears - Install.pdf
Transmission and Output Transfer Gears - Remove.pdf
Vacuum Pump - Remove and Install.pdf
Wheel - Remove and Install.pdf
RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train).pdf
RENR3037 - Systems Operation (554 Forwarder & 574 Forwarder Electrical System).pdf
RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement)
Aftercooler - Remove and Install.pdf
Air Cleaner - Remove and Install.pdf
Air Inlet Heater - Remove and Install.pdf
Alternator - Remove and Install - Engine in Chassis.pdf
Electric Starting Motor - Remove and Install - Engine in Chassis.pdf
Engine and Cab Preheater - Remove and Install.pdf
Engine and Pumps - Install.pdf
Engine and Pumps - Remove.pdf
Engine from Pumps - Separate.pdf
Engine to Pumps - Connect.pdf
Fan Drive - Remove and Install.pdf
Fuel Filter (Secondary) and Fuel Filter Base - Remove and Install.pdf
Fuel Priming Pump and Primary Filter (Water Separator) - Remove and Install.pdf
Fuel Tank - Install.pdf
Fuel Tank - Remove.pdf
Governor - Remove and Install.pdf
Hood - Remove and Install.pdf
Muffler - Remove and Install.pdf
Radiator - Remove and Install.pdf
Refrigerant Compressor - Remove and Install.pdf
Refrigerant Condenser Fans and Motor - Remove and Install.pdf
Refrigerant Condenser - Remove and Install - 1FM1-283, 285, 287.pdf
Refrigerant Condenser - Remove and Install - 1FM284, 286, 288-UP.pdf
Refrigerant Receiver-Dryer - Remove and Install.pdf
Steering Frame Lock - Separate and Connect.pdf
System Pressure - Release.pdf
Turbocharger - Remove and Install.pdf
Water Pump - Remove and Install.pdf
Water Temperature Regulator - Remove and Install - Engine in Chassis.pdf
RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement).pdf
RENR3061 - Schematic (574 Forwarder Hydraulic System)
Collage 1.pdf
Collage 2.pdf
Main 1.pdf
Main 2.pdf
RENR3061 - Schematic (574 Forwarder Hydraulic System).pdf
RENR6058 - Schematic (574 Forwarder Hydraulic System).pdf
EXCERPT:
Disassembly Procedure
Start By:
A. Remove the implement control valve from the machine. Refer to Disassembly and Assembly, "Control Valve (Implement) - Remove" for the machine that is being serviced.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.
1. Remove two screws and lock washers (1) from solenoid (2). Remove solenoid (2) from the control valve.
...
Caterpillar Forwarder 554 & 574 WorkShop Service Manual