Logo

Cart

Click title to display cart contents.
0 Items $0.00

Caterpillar Forwarder 554 & 574 Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $65.00

Complete workshop repair service manual with electrical wiring diagrams for Caterpillar Forwarder 554 & 574. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

Caterpillar Forwarder 554 & 574 service repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

1,532 pages, bookmarked, Searchable, Printable, high quality PDF

MANUAL LIST:
RENR6058 - Schematic (574 Forwarder Hydraulic System).pdf
RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems)
RENR3026 - Specifications (554 & 574 Forwarders Power Train)
RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train)
RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System)
RENR3032 - Schematic (554 Forwarder Hydraulic System)
RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train)
RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement)
RENR3061 - Schematic (574 Forwarder Hydraulic System)
RENR3037 - Systems Operation (554 Forwarder & 574 Forwarder Electrical System).pdf

...
 RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems)
    Air Conditioner - Assemble.pdf
    Air Conditioner - Disassemble.pdf
    Air Conditioner - Install.pdf
    Air Conditioner - Remove.pdf
    Bank Valve (Eight) (Implement) - Assemble.pdf
    Bank Valve (Eight) (Implement) - Disassemble.pdf
    Bank Valve (Eight) (Implement) - Install.pdf
    Bank Valve (Eight) (Implement) - Remove.pdf
    Bank Valve (Two) (Bogie Lift) - Assemble.pdf
    Bank Valve (Two) (Bogie Lift) - Disassemble.pdf
    Bank Valve (Two) (Bogie Lift) - Install.pdf
    Bank Valve (Two) (Bogie Lift) - Remove.pdf
    Bogie Cylinder - Install.pdf
    Bogie Cylinder - Remove.pdf
    Bogie Float Valve - Assemble.pdf
    Bogie Float Valve - Disassemble.pdf
    Bogie Float Valve - Install.pdf
    Bogie Float Valve - Remove.pdf
    Boom Cylinder - Install.pdf
    Boom Cylinder - Remove.pdf
    Boom - Install.pdf
    Boom - Remove.pdf
    Boom Tilt Cylinder - Install.pdf
    Boom Tilt Cylinder - Remove.pdf
    Bunk - Install.pdf
    Bunk - Remove.pdf
    Cab - Install.pdf
    Cab - Remove.pdf
    Cab Support Bar - Install.pdf
    Cab Support Bar - Remove.pdf
    Cab Tilt Cylinder - Install.pdf
    Cab Tilt Cylinder - Remove.pdf
    Combination Valve (Four Function) - Assemble.pdf
    Combination Valve (Four Function) - Disassemble.pdf
    Combination Valve (Four Function) - Install.pdf
    Combination Valve (Four Function) - Remove.pdf
    Extendable Stick Cylinder - Install.pdf
    Extendable Stick Cylinder - Remove.pdf
    Extendable Stick - Install.pdf
    Extendable Stick - Remove.pdf
    Front Frame from Rear Frame - Separate.pdf
    Gate Cylinder (Horizontal) - Install.pdf
    Gate Cylinder (Horizontal) - Remove.pdf
    Gate Cylinder (Vertical) - Install.pdf
    Gate Cylinder (Vertical) - Remove.pdf
    Gate - Install.pdf
    Gate - Remove.pdf
    Grapple Cylinder - Install.pdf
    Grapple Cylinder - Remove.pdf
    Grapple - Install.pdf
    Grapple - Remove.pdf
    Grapple Rotator - Assemble.pdf
    Grapple Rotator - Disassemble.pdf
    Grapple Rotator - Install.pdf
    Grapple Rotator - Remove.pdf
    Hand Pump (Cab Tilt) - Install.pdf
    Hydraulic Tank - Install.pdf
    Hydraulic Tank - Remove.pdf
    Ladder Cylinder - Install.pdf
    Ladder Cylinder - Remove.pdf
    Log Loader Pillar - Assemble.pdf
    Log Loader Pillar - Disassemble.pdf
    Log Loader Pillar - Install.pdf
    Log Loader Pillar - Remove.pdf
    Oscillation Lock Cylinder - Install.pdf
    Oscillation Lock Cylinder - Remove.pdf
    Piston Pump (Implement) - Assemble.pdf
    Piston Pump (Implement) - Disassemble.pdf
    Piston Pump (Implement) - Install.pdf
    Piston Pump (Implement) - Remove.pdf
    Pressure Reducing Valve (Maximum Signal) - Assemble.pdf
    Pressure Reducing Valve (Maximum Signal) - Disassemble.pdf
    Pressure Reducing Valve (Maximum Signal) - Install.pdf
    Pressure Reducing Valve (Maximum Signal) - Remove.pdf
    Pressure Reducing Valve (Steering Signal) - Assemble.pdf
    Pressure Reducing Valve (Steering Signal) - Disassemble.pdf
    Pressure Reducing Valve (Steering Signal) - Install.pdf
    Pressure Reducing Valve (Steering Signal) - Remove.pdf
    Priority Valve (Steering) - Assemble.pdf
    Priority Valve (Steering) - Disassemble.pdf
    Priority Valve (Steering) - Install.pdf
    Priority Valve (Steering) - Remove.pdf
    Pump Drive - Remove and Install.pdf
    Relief Valve (Swing Crossover) - Assemble.pdf
    Relief Valve (Swing Crossover) - Disassemble.pdf
    Relief Valve (Swing Crossover) - Install.pdf
    Relief Valve (Swing Crossover) - Remove.pdf
    Seat - Remove and Install.pdf
    Steering Cylinder - Install.pdf
    Steering Cylinder - Remove.pdf
    Steering Frame Lock - Separate and Connect.pdf
    Steering Metering Pump - Assemble.pdf
    Steering Metering Pump - Disassemble.pdf
    Steering Metering Pump - Install.pdf
    Steering Metering Pump - Remove.pdf
    Stick Cylinder - Install.pdf
    Stick Cylinder - Remove.pdf
    Stick - Install.pdf
    Stick - Remove.pdf
    Window Wiper and Wiper Motor - Remove and Install.pdf
 RENR3025 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Machine Systems).pdf
 RENR3026 - Specifications (554 & 574 Forwarders Power Train)
    Accumulator (Brake).pdf
    Accumulator Charging Valve (Brake).pdf
    Accumulator (Transmission Gearbox).pdf
    Bypass Valve (Power Train Oil Cooler).pdf
    Combination Valve (Differential Lock and Parking Brake).pdf
    Front Bogie.pdf
    Gear Pump (Transmission Gearbox).pdf
    Gearshift Control Valve.pdf
    Oil Filter (Power Train Charging System).pdf
    Oil Filter (Transmission Gearbox).pdf
    Oil Level Sensor (Power Train Oil Tank).pdf
    Piston Motor (Power Train).pdf
    Piston Pump (Power Train).pdf
    Pressure Sensor (Drive Loop).pdf
    Pressure Sensor (Gearshift).pdf
    Pressure Sensor (Power Train Charging System).pdf
    Pressure Switch (Brake Light).pdf
    Pressure Switch (Parking Brake Oil).pdf
    Pressure Switch (Service Brake Oil).pdf
    Rear Bogie.pdf
    Rim Group.pdf
    Solenoid Valve (Cold Start).pdf
    Temperature Sensor (Transmission Gearbox Oil and Power Train Oil).pdf
    Transmission Gearbox - 554 Forwarder.pdf
    Transmission Gearbox - 574 Forwarder (1FM1-236).pdf
    Transmission Gearbox - 574 Forwarder (1FM237-433).pdf
    Transmission Gearbox.pdf
 RENR3026 - Specifications (554 & 574 Forwarders Power Train).pdf
 RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train)
    Accelerator Pedal.pdf
    Braking System.pdf
    Differential.pdf
    Final Drive and Bogie.pdf
    Gearshift Valve - 1FM1-433.pdf
    Gearshift Valve - 554 Forwarder 1AM1-UP.pdf
    Gearshift Valve - 574 Forwarder 1FM434-UP.pdf
    General Information.pdf
    Hydrostatic Drive System.pdf
    Monitoring System.pdf
    Off Switches.pdf
    Piston Motor (Power Train) - 554 Forwarder and 574 Forwarder 1FM1-433.pdf
    Piston Motor (Power Train).pdf
    Piston Pump (Power Train) - 554 Forwarder and 574 Forwarder 1FM1-433.pdf
    Piston Pump (Power Train) - 574 Forwarder 1FM434-UP.pdf
    Transmission Gearbox - 554 Forwarder.pdf
    Transmission Gearbox - 574 Forwarder 1FM1-433.pdf
    Transmission Gearbox - 574 Forwarder 1FM434-UP.pdf
 RENR3027 - Systems Operation (554 Forwarder & 574 Forwarder Power Train).pdf
 RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System)
    Bank Valve (Eight) (Implement).pdf
    Bank Valve (Two) (Bogie Lift).pdf
    Bogie Float Valve.pdf
    Boom Cylinder.pdf
    Boom Tilt Cylinder.pdf
    Bypass Valve (Hydraulic Oil Cooler).pdf
    Combination Valve (Ladder and Gate).pdf
    Diverter Valve (Boom Tilt Cylinder and Gate Cylinder).pdf
    Extendable Stick Cylinder.pdf
    Grapple Cylinder.pdf
    Grapple Rotator.pdf
    Hydraulic Cylinder (Bogie Lift and Steering).pdf
    Hydraulic Tank Fill Pump and Motor.pdf
    Lift Cylinder.pdf
    Log Loader Pillar Base.pdf
    Oil Filter (Implement Case Drain).pdf
    Oil Level Sensor (Hydraulic Tank).pdf
    Pilot Oil Accumulator (Dead Engine Lower).pdf
    Piston Pump (Implement) - 554 Forwarder.pdf
    Piston Pump (Implement) - 574 Forwarder.pdf
    Pressure Reducing Valve (Maximum Signal).pdf
    Pressure Reducing Valve (Steering Signal).pdf
    Pressure Sensor (Filter Return).pdf
    Priority Valve (Steering).pdf
    Relief Valve (Swing Crossover).pdf
    Solenoid Valve (Oscillation Lock).pdf
    Steering Metering Pump.pdf
    Stick Cylinder.pdf
    Toggle Switch (Tank Fill and Vacuum).pdf
    Vacuum Pump and Motor.pdf
 RENR3029 - Specifications (554 Forwarder & 574 Forwarder Hydraulic System).pdf
 RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System)
    Bank Valve (Eight) (Implement).pdf
    Bogie Lift System.pdf
    Gate Control System.pdf
    General Information.pdf
    Implement Control System.pdf
    Implement Pump.pdf
    Load Sensing Signal System.pdf
    Main Hydraulic System.pdf
    Monitoring and Control System.pdf
    Oscillation Lock System.pdf
    Steering System.pdf
    Swing System.pdf
 RENR3030 - Systems Operation (554 Forwarder & 574 Forwarder Hydraulic System).pdf
 RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System)
    Boom Tilt Cylinder and Gate Cylinder (Horizontal) Pressure - Test and Adjust.pdf
    Combination Valve (Ladder and Gate) - Test and Adjust.pdf
    Extendable Stick Cylinder Pressure - Test and Adjust.pdf
    Grapple Cylinder Pressure - Test and Adjust.pdf
    Implement Control - Test and Adjust.pdf
    Implement Pump High Pressure Cutoff - Test and Adjust.pdf
    Implement Pump Margin Pressure - Test and Adjust.pdf
    Implement Pump Standby Pressure - Test and Adjust.pdf
    Machine Preparation for Troubleshooting.pdf
    Pilot Hydraulic System - Purge.pdf
    Pilot Oil Accumulator (Dead Engine Lower) - Test and Charge.pdf
    Pressure Reducing Valve (Steering Signal) - Test and Adjust.pdf
    Relief Valve (Gate Cylinder) - Test and Adjust - Vertical.pdf
    Steering Cylinder Pressure - Test and Adjust.pdf
    Troubleshooting.pdf
    Visual Inspection.pdf
 RENR3031 - Testing & Adjusting (554 Forwarder & 574 Forwarder Hydraulic System).pdf
 RENR3032 - Schematic (554 Forwarder Hydraulic System)
    Main.pdf
 RENR3032 - Schematic (554 Forwarder Hydraulic System).pdf
 RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train)
    Accumulator (Brake) - Remove and Install.pdf
    Accumulator (Transmission) - Remove and Install.pdf
    Bogie - Assemble.pdf
    Bogie Axle (Front) - Install.pdf
    Bogie Axle (Front) - Remove.pdf
    Bogie Axle (Rear) - Install.pdf
    Bogie Axle (Rear) - Remove and Install.pdf
    Bogie - Disassemble.pdf
    Bogie - Install.pdf
    Bogie Oscillation Bearing - Remove and Install.pdf
    Bogie - Remove.pdf
    Brake - Assemble.pdf
    Brake Charging Valve - Remove and Install.pdf
    Brake Control Valve (Front) - Remove and Install.pdf
    Brake Control Valve (Rear) - Remove and Install.pdf
    Brake Cylinder - Install.pdf
    Brake Cylinder - Remove.pdf
    Brake - Disassemble.pdf
    Differential - Assemble.pdf
    Differential - Disassemble.pdf
    Differential from Left Brake - Separate.pdf
    Differential Lock - Remove and Install.pdf
    Differential to Left Brake - Connect.pdf
    Drive Shaft (Center) - Remove and Install.pdf
    Drive Shaft (Front) - Remove and Install.pdf
    Drive Shaft (Rear) - Remove and Install.pdf
    Final Drive - Assemble.pdf
    Final Drive - Disassemble.pdf
    Final Drive - Install.pdf
    Final Drive - Remove.pdf
    Gear Pump (Transmission) - Assemble.pdf
    Gear Pump (Transmission) - Disassemble.pdf
    Gear Pump (Transmission) - Install.pdf
    Gear Pump (Transmission) - Remove.pdf
    Gearshift Valve - Assemble.pdf
    Gearshift Valve - Disassemble.pdf
    Gearshift Valve - Install.pdf
    Gearshift Valve - Remove.pdf
    Hydraulic Tank Fill Pump and Motor - Remove and Install.pdf
    Hydraulic Tank - Install.pdf
    Hydraulic Tank - Remove.pdf
    Piston Motor (Power Train) - Assemble.pdf
    Piston Motor (Power Train) - Disassemble.pdf
    Piston Motor (Power Train) - Install.pdf
    Piston Motor (Power Train) - Remove.pdf
    Piston Pump (Power Train) - Assemble.pdf
    Piston Pump (Power Train) - Disassemble.pdf
    Piston Pump (Power Train) - Install.pdf
    Piston Pump (Power Train) - Remove.pdf
    Right Brake from Differential - Separate.pdf
    Right Brake to Differential - Connect.pdf
    Steering Frame Lock - Separate and Connect.pdf
    Transmission and Output Transfer Gears - Assemble.pdf
    Transmission and Output Transfer Gears - Disassemble.pdf
    Transmission and Output Transfer Gears - Install.pdf
    Transmission and Output Transfer Gears - Remove.pdf
    Vacuum Pump - Remove and Install.pdf
    Wheel - Remove and Install.pdf
 RENR3033 - Disassembly & Assembly (554 Forwarder & 574 Forwarder Power Train).pdf
 RENR3037 - Systems Operation (554 Forwarder & 574 Forwarder Electrical System).pdf
 RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement)
    Aftercooler - Remove and Install.pdf
    Air Cleaner - Remove and Install.pdf
    Air Inlet Heater - Remove and Install.pdf
    Alternator - Remove and Install - Engine in Chassis.pdf
    Electric Starting Motor - Remove and Install - Engine in Chassis.pdf
    Engine and Cab Preheater - Remove and Install.pdf
    Engine and Pumps - Install.pdf
    Engine and Pumps - Remove.pdf
    Engine from Pumps - Separate.pdf
    Engine to Pumps - Connect.pdf
    Fan Drive - Remove and Install.pdf
    Fuel Filter (Secondary) and Fuel Filter Base - Remove and Install.pdf
    Fuel Priming Pump and Primary Filter (Water Separator) - Remove and Install.pdf
    Fuel Tank - Install.pdf
    Fuel Tank - Remove.pdf
    Governor - Remove and Install.pdf
    Hood - Remove and Install.pdf
    Muffler - Remove and Install.pdf
    Radiator - Remove and Install.pdf
    Refrigerant Compressor - Remove and Install.pdf
    Refrigerant Condenser Fans and Motor - Remove and Install.pdf
    Refrigerant Condenser - Remove and Install - 1FM1-283, 285, 287.pdf
    Refrigerant Condenser - Remove and Install - 1FM284, 286, 288-UP.pdf
    Refrigerant Receiver-Dryer - Remove and Install.pdf
    Steering Frame Lock - Separate and Connect.pdf
    System Pressure - Release.pdf
    Turbocharger - Remove and Install.pdf
    Water Pump - Remove and Install.pdf
    Water Temperature Regulator - Remove and Install - Engine in Chassis.pdf
 RENR3038 - Disassembly & Assembly (574 Forwarder Engine Supplement).pdf
 RENR3061 - Schematic (574 Forwarder Hydraulic System)
    Collage 1.pdf
    Collage 2.pdf
    Main 1.pdf
    Main 2.pdf
 RENR3061 - Schematic (574 Forwarder Hydraulic System).pdf
 RENR6058 - Schematic (574 Forwarder Hydraulic System).pdf

EXCERPT:
Disassembly Procedure
Start By:
A. Remove the implement control valve from the machine. Refer to Disassembly and Assembly, "Control Valve (Implement) - Remove" for the machine that is being serviced.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.
1. Remove two screws and lock washers (1) from solenoid (2). Remove solenoid (2) from the control valve.
...

Caterpillar Forwarder 554 & 574 WorkShop Service Manual


Use Promo Code 10POFF for additional 10% off discount (valid for Credit/Debit Card payments only).

Due to the continuous Paypal fee hikes, Paypal users, to bear the final burden of Paypal taxation, will be charged for additional 10% fee instead of 10% discount. Please avoid Paypal if possible!

Instant Download feature not available for orders paid with Paypal.