BMW Z8 2000-2003 Workshop Repair & Service Manual
Catalog:
Model:
Complete digital official shop manual contains service, maintenance, and troubleshooting information for the BMW Z8 2000-2003. Diagnostic and repair procedures are covered in great detail to repair, maintain, rebuild, refurbish or restore your vehicle like a professional mechanic in local service/repair workshop. This cost-effective quality manual is 100% complete and intact as should be without any missing pages. It is the same factory shop manual used by dealers that guaranteed to be fully functional to save your precious time.
This manual for BMW Z8 2000-2003 is divided into different sections. Each section covers a specific component or system and, in addition to the standard service procedures, includes disassembling, inspecting, and assembling instructions. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. It is in the cross-platform PDF document format so that it works like a charm on all kinds of devices. You do not need to be skilled with a computer to use the manual.
EXCERPT:
2000-2003 ENGINE Engine Mechanical - Repair Instructions - Z8
CONNECTING ROD WITH BEARINGS
11 24 571 REPLACING ALL CONROD BEARINGS (S62)
(piston removed)
Install new conrod bearing shells.
Insert one blue (1) and one red (2) bearing shell for each conrod.
Fig. 413: Installing New Conrod Bearing Shells
Install pistons, refer to 11 25 530 REMOVING AND INSTALLING/REPLACING ALL PISTONS (S62) .
Check connecting-rod bearing clearance:
Fig. 414: Checking Conrod Bearing Clearance
Piston in BDC position.
Fit special tool 00 2 590 (Plastigage Type PG 1) to the oil-free crankshaft.
Place bearing caps in position, making sure that matching numbers are paired.
Use the old connecting-rod bolts to check connecting-rod clearance.
Tighten down conrod bolts with special tool 00 9 120.
Fig. 415: Tightening Conrod Bolts
Tightening Torque 11 24 1AZ, refer to 11 24 CONNECTING RODS AND BEARINGS .
Remove bearing cover and read off bearing clearance across width of pinched plastic thread with the help of the measuring scale.
Fig. 416: Checking Connecting-Rod Clearance
Conrod bearing clearance, refer to 11 21 CRANKSHAFT AND BEARINGS S62 .
Remove plastic thread.
Lubricate crankshaft and bearing shells.
Insert new conrod bolts and tighten down.
Tightening Torque 11 24 1AZ, refer to 11 24 CONNECTING RODS AND BEARINGS .
PISTON WITH RINGS
11 25 530 REMOVING AND INSTALLING/REPLACING ALL PISTONS (S62)
Special tools required:
00 1 450
00 9 120
11 3 480
11 7 180
(engine removed)
Removal
Removal of pistons is described separately from installation. Assembly sequence for removal and installation is
different.
Mount engine on special tool 00 1 450 and remove both cylinder heads. Refer to 11 12 517 Removing and installing both cylinder heads (S62) .
Remove lower oil sump section.
Remove oil circuit changeover valve on left and right. Refer to 11 13 540 Removing and installing/replacing
left oil circuit changeover valve (S62) and 11 13 550 Removing and installing/replacing right oil circuit
changeover valve (S62) .
CAUTION: Reinstall piston, connecting rod and bearing shells back in the same position and in the same installation location.
Conrod and conrod bearing cover are designated with same pair number:
do not interchange / confuse.
In the E52 Series, the oil pump is removed with the upper oil sump section. The procedure is described in the work step Removing and installing upper oil sump section. Refer to 11 13 010 Removing and installing/replacing upper oil sump section (S62) .
In event of heavy oil carbon residue:
Carefully remove oil carbon residue from cylinder wall.
...