Logo

Cart

Click title to display cart contents.
0 Items $0.00

Isuzu AH-6UZ1 Model Industrial Diesel Engine Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $45.00

Complete workshop repair service manual for Isuzu AH-6UZ1 Model Industrial Diesel Engine. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Isuzu AH-6UZ1 Model Industrial Diesel Engine service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

IDE-2440 - Isuzu AH-6UZ1 Model Industrial Diesel Engine Workshop Manual.pdf

EXCERPT:
1A-6 6UZ1 Engine Mechanical
Function Check
Precautions
1. Engine parts are extremely hot straight after a drive, so cool them down sufficiently.
2. Diagnostic codes (self-diagnosis codes) are recorded on the ECU memory. Check the contents of the memory stored on ECU using a scan tool before starting an inspection on a sensor.
3. Make sure to disconnect battery terminals to prevent damages on electronic parts such as sensors or a fire.
4. High voltage at injector harnesses or electromagnetic valves can cause an electric shock. Make sure to turn the starter switch to “OFF” and pull out the key when carrying out a service.
Measurement of the compression pressure
Measure the compression pressure when the engine is warmed-up and there are no errors occurring at batteries or starters.
1. Remove the head cover.
• Remove the air breather hoses, and then remove the head cover.
2. Loosen the injection pipe.
3. Remove the injector harness.
• Loosen the terminal tightening nut and remove the harness.
• Remove the harness BRKT-ASM.
Note:
When the injector harness is removed, its ID code plate is also removed. Do not confuse it with other injector ID code plates.
4. Remove the injector leak-off pipe.
5. Remove all injector ASM.
• Store them in numeric order.
6. Install the compression gauge.
• Insert two sheets of the gasket (2) into the compression gauge adapter (1) 1-8531-7019-0, and then insert it to the injector installation hole.

Additional 10% off on US$30+ order paid with Credit Card: 10POFF.

To pay in your local currency (EURO, GBP, AUD, CAD, HKD, JPY, etc.), please contact us.