Logo

Cart

Click title to display cart contents.
0 Items $0.00

Bobcat S130 Skid-Steer Loader Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $39.00

Complete workshop repair service manual with electrical wiring diagrams for Bobcat S130 Skid-Steer Loader. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Bobcat S130 Skid-Steer Loader service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

6902679 (12-06) - S130 Skid-Steer Loader Operation & Maintenance Manual.pdf
6902680 (3-06) - S130 Skid-Steer Loader Service Manual.pdf
6902713 (11-03) - S130 Skid-Steer Loader Part Manual.pdf
6903136 (12-06) - S130 Skid-Steer Loader.pdf
6903151 (2-06) - S130 Skid-Steer Loader.pdf
6904119 (4-08) - S130 Skid-Steer Loader.pdf
6904121 (7-09) - S130 Skid-Steer Loader.pdf
6986565 (7-09) - S130 Skid-Steer Loader.pdf
6986965 (4-08) - S130 Skid-Steer Loader.pdf
6986977 (3-11) - S130 Skid-Steer Loader.pdf
6986977 (11-10) - S130 Skid-Steer Loader.pdf
6987032 (11-10) - S130 Skid-Steer Loader.pdf

EXCERPT:
CONTENTS
SAFETY & MAINTENANCE . . . . .. . . 10-01
HYDRAULIC SYSTEM . . . . . . . 20-01
HYDROSTATIC SYSTEM . . . . .. . . . 30-01
DRIVE SYSTEM . . . . .40-01
MAINFRAME . . . . .. . 50-01
ELECTRICAL SYSTEM & ANALYSIS . . . . . . . 60-01
ENGINE SERVICE . . . . . . . 70-01
HEATING, VENTILATION, AIR CONDITIONING . . . . . . . . 80-01
SPECIFICATIONS . . . . . . . SPEC-01
ALPHABETICAL INDEX . . . . .. . .INDEX-01

CONTROL PANEL (CONT’D)
Linkage Neutral (Adjusting) (Cont’d)
Figure 50-100-36
Torque the left pump pintle adjustment lock bolts (Item 1) [Figure 50-100-36] to 47,5 - 54,2 N•m (35 - 40 ft-lb).
Repeat the adjustment procedure for the right pump.
Torque the right pump pintle adjustment lock bolts (Item 2) [Figure 50-100-36] to 47,5 - 54,2 N•m (35 - 40 ft-lb).
Test both levers by moving them backward and forward and letting them return to neutral by the return spring force.
If the levers do not return to neutral and the wheels / tracks do not come to a complete stop, repeat the adjustment procedure again.
Stop the engine.
Remove one pintle adjustment bolt (Item 1) [Figure 50-100-36] at a time and apply Loctite® 242 or equivalent thread locker to the bolt and re-install the bolt. Torque the bolt to 47,5 - 54,2 N•m (35 - 40 ft-lb). Repeat for the three remaining pintle adjustment lock bolts.
NOTE: To maintain proper adjustment setting, remove and reinstall only one bolt at a time.
New bolts can be installed with pre applied Loctite®.
Remove the loader remote start tool.
NOTE: After the neutral adjustment is completed on both pumps, the linkage travel adjustment MUST be completed. (See Linkage Travel (Adjusting) on Page 50-100-17.)


Use Promo Code 10POFF for additional 10% off discount (valid for Credit/Debit Card payments only).

Due to the continuous Paypal fee hikes, Paypal users, to bear the final burden of Paypal taxation, will be charged for additional 10% fee instead of 10% discount. Please avoid Paypal if possible!

Instant Download feature not available for orders paid with Paypal.