Logo

Cart

Click title to display cart contents.
0 Items $0.00

Ford Festiva 1988-1995 Factory Service & Shop Manual

Catalog: 

Make: 

Model: 

US Dollar: $19.99

Complete workshop & service manual with electrical wiring diagrams for Ford Festiva 1988-1995. It's the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.

This Ford Festiva 1988-1995 service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting…) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.

EXCERPT:
Installation (1.6L)
1. Install transaxle to engine in reverse order of removal. Attach hoist to engine/transaxle assembly and position assembly in vehicle. Before engine contacts mounts, route starter, alternator and oil pressure sensor wiring, and connect oil pressure sensor. Lower engine until front mount seats on crossmember.
Install right engine mount through-bolt. DO NOT tighten through-bolt at this time.
2. Remove hoist. Raise vehicle and support with jackstands. Align rear engine mount to crossmember, and install retaining nuts to front and rear engine mounts. Tighten nuts to specification. See TORQUE SPECIFICATIONS TABLE at the end of this article.
3. On manual transaxles, connect shift coupling and stabilizer. On automatic transaxles, connect shift linkage and oil cooler lines. Tighten linkage retaining bolt, shift cable pivot and oil cooler hose clamps to specification. On all models, connect front exhaust pipe to manifold (or turbocharger). Install exhaust pipe to support bracket. Tighten bolts and manifold (or turbocharger) to specification. Attach rubber
exhaust hangers. Position cross brace. Tighten retaining nut and bolt and right control arm front bolt.
4. Install drive axles. Install ball joint retaining bolts and tighten to specification. Mount A/C compressor to engine (if equipped). Tighten lower retaining bolts to specification. See, at the end of this article,
TORQUE SPECIFICATIONS TABLE. Install splash guards. Install tire and wheel assemblies.
Tighten retaining nuts to specification.
5. Lower vehicle. Install upper A/C compressor bolts (if equipped). Tighten bolts to specification. Tighten right engine mount through-bolt to specification. Connect alternator wiring.
6. Position power steering pump bracket on stud. Lower pump into engine compartment. Install power steering pump bracket retaining bolts and nut. Install power steering pump and belt. Tighten adjustment nut and pivot bolt to specification. See, at the end of this article, TORQUE SPECIFICATIONS TABLE.
7. Install engine oil dipstick and retaining clip. Install ground strap and ground wire to cylinder head. Install clutch cable (if equipped). Connect clutch slave cylinder hydraulic line (if equipped). Connect transmission electrical connectors. Connect fuel lines to fuel filter and pressure regulator. Install intake air tube to throttle body.
8. Install intercooler hoses on turbocharged models. Install air cleaner assembly brackets. Install air cleaner assembly with airflow meter attached. Install intake air tube. Install coil and airflow meter connectors.
Connect coolant crankcase and air by-pass hoses. Install vacuum hoses as noted in disassembly.
9. Connect accelerator cable. Install retaining bracket. Install power brake booster hose. Remove speedometer cable from transaxle. Fill transaxle to specification. See CAPACITIES in SERVICE & ADJUSTMENT SPECIFICATIONS article in ENGINE PERFORMANCE. Install speedometer cable.
Connect speedometer cable connector. Fill engine oil to capacity.
10. Install radiator/fan assembly. Tighten bracket retaining bolts to specification. Connect coolant hoses and fan electrical connector. Fill coolant to specification.
11. Install hood and connect washer hose. Install battery tray support, battery tray, battery and battery holddown. Connect negative battery cable. Evacuate and charge air conditioning system (if equipped). Road test vehicle and inspect for leaks.

Additional 10% off on US$30+ order paid with Credit Card: 10POFF.

To pay in your local currency (EURO, GBP, AUD, CAD, HKD, JPY, etc.), please contact us.